Render Respray Yorkshire
What belongs on a render colour-change completion sheet
Keep the product, colour, preparation and treated areas together in a short record that will still make sense years later.

Three years after a wall is recoloured, a small repair needs touching up. The owner remembers the shade as warm white, but the old invoice says only paint exterior. A short completion record could have preserved the exact product, colour and treated area.
Give the record a clear purpose
A colour-change completion sheet is a practical handover document. It can bring together the agreed scope, the materials used and the information needed to care for them. It is not automatically a warranty, a manufacturer approval or a statement that every underlying building defect has been resolved.
Agree the intended contents before work finishes. Otherwise the contractor may reasonably think that a product name on an invoice is sufficient while the homeowner expects annotated photographs and maintenance instructions. A modest, agreed record is easier to produce than reconstructing the whole job after the equipment and packaging have gone.
Keep the language factual. Record completed operations and identified exclusions, and distinguish any remaining recommendation from work actually carried out. A phrase such as all walls repaired can be misleading if the scope involved only specified local patches. The record should make the quotation clearer rather than expand its claims.
Show exactly which surfaces changed
Use elevation names that someone unfamiliar with the job can understand. Front, rear and side can work if a simple photograph or sketch makes the orientation obvious. Where a house has several returns, extensions or detached structures, label them separately rather than relying on a single description of the outside.
Identify the extent of the coating on each elevation. The main wall may have been recoloured while a plinth, chimney, porch ceiling or boundary wall was retained. Different finishes can meet at small details, so record those boundaries where they could otherwise be misunderstood.
A reveal turns back towards the window, while a projecting sill has its own edges and underside. Saying the window area was painted does not establish which of those surfaces were included. Use the photograph to identify the actual boundary. The example entries below show the level of detail; they describe no actual completed project.
Scroll sideways to see the full table. Keyboard: focus the table, then use the arrow keys.
| Vague entry | More useful wording |
|---|---|
| Front completed | F1: front rendered face and porch return shown on photograph F1; exposed brick plinth excluded |
| Repairs done | R1: render repair beside the upper window shown before coating and after preparation; repair material recorded separately |
| Same colour throughout | Record the coating maker, product, colour reference and batch references for each included elevation |
| Pipe sorted | State whether the downpipe was repaired, removed and reinstated, or left for a separate trade |
| No problems | List any remaining item and its responsible party; record the actual inspection rather than a blanket assurance |
A colour name is only part of the material record
Write down the manufacturer, product and colour reference together. Similar colour names can occur in different ranges, and a code by itself may not identify the material. Include the finish or texture description where it forms part of the chosen product, along with any separate preparation or coating stages.
Retaining batch information can help explain how materials were used on the job. The current KEIM Soldalit sheet, for example, advises using material from the same tinting batch on a surface. That is a product-specific instruction, not a reason to promise that any future tin with the same colour reference will make an invisible repair.
A photograph of a legible label is often helpful, but it should be connected to the actual treated area. If different products or colours were used, say where each belongs. A folder containing several unlabelled tin photographs leaves the next person guessing which one relates to the gable and which to the base.

Include preparation that affects future work
The visible colour does not reveal everything underneath it. Record significant preparation and repairs in plain terms, especially where the treatment differs from the rest of the elevation. This might include identified areas of unstable coating removed, local render repairs or a specified preparation product used on an assessed background.
Where old paint was retained, the record should say so. A later contractor should not read bare render preparation and assume that description applies to the entire elevation when only a repaired patch was exposed. Similarly, local treatment of an absorbent repair is different from applying the same product across all retained paint. Record the actual sequence and its boundaries, rather than copying an idealised product specification into the completion sheet.
Where a trial informed the final specification, retain its location, accepted result and any agreed change. That links the sample to the work completed. It can also explain why a particular preparation method or finishing boundary was chosen, without suggesting that the trial proves every aspect of long-term performance.
Make exclusions easy to see
A complete-looking elevation may contain areas that were intentionally left alone. Exclusions should be understandable without searching through a chain of messages. If an adjoining roof, window seal or downpipe defect remained outside the coating contract, identify it and any separately agreed follow-up.
Keep exclusions separate from unfinished work. A retained brick plinth agreed from the start is different from a trim awaiting reinstatement. One describes the chosen boundary; the other needs an action. Combining both under miscellaneous notes makes it harder to know whether the project is actually complete.
Existing texture variations deserve a clear photograph if they remain visible. A colour change can make separate areas the same colour without making their grain size or repair profile identical. Distinguish an accepted existing difference from an unfinished item. That prevents a future reader treating every visible patch as new damage, while preserving the owner's ability to query work that has not met the agreed finish.
Attach care advice for this finish
Maintenance instructions should relate to the material installed. A general instruction to pressure-wash the wall is not suitable for every render finish. Weber's cleaning guidance distinguishes finishes and specifically advises against pressure washing drydash. The relevant product and substrate advice should guide any later cleaning operation.
Keep the manufacturer's document title or link and its version where available. A useful handover explains which document applies to which product, rather than attaching a collection of unrelated brochures. If the contractor or manufacturer has given project-specific advice, preserve that separately with its scope.
Keep later changes with the original record. If a new cable is fixed through the coating, a downpipe leaks or a window is replaced, note the date and add a photograph before the making-good work conceals it. That sequence helps a future contractor understand the surface they are inspecting. It does not establish liability or diagnose the cause of a mark from photographs alone.
Keep photographs and paperwork connected
A simple naming system makes the record easier to use. Match photographs to the elevation labels and note the date, particularly where work was phased. The record can be a concise PDF, a printed sheet with images or an organised folder; the format matters less than whether another person can follow it.
Avoid relying on a temporary message link or photographs held only on a contractor's phone. Keep a copy with the property records. If a tenant or managing agent needs relevant care information, provide the useful parts through the normal property-management arrangements, without distributing unnecessary personal details.
Pair an overview with any close detail needed to understand a repair. A photograph of a small patch may show its texture clearly but give no clue which window it sits beside; a distant whole-house picture has the opposite limitation. Use matching references so the repair material and its position can be found together. Keep original-resolution copies where labels or small edges need to remain legible.
Finish with an agreed list of remaining actions
Review the sheet alongside the completed work. Confirm that the named areas correspond to the actual scope, the products are identifiable and temporary protection has been removed as agreed. Record any outstanding item with its responsible person and arrangement for follow-up.
Check the remaining-actions list against the wall before access is removed. A small unfinished return high beside a window is easy to overlook in a wide photograph but awkward to reach afterwards. Separate that from a later appointment for a different trade or a deliberate exclusion. Name the item and responsibility, then update it when it is resolved; do not use a general signed-off line to hide outstanding work.

Questions and answers
Is a completion sheet a warranty?
Not by itself. It records the work and materials. Any warranty or guarantee must be separately identified by its genuine terms, issuer and applicable conditions.
Will the colour reference guarantee an invisible future touch-up?
No. The reference helps identify the material, but weathering, texture, application and the repaired area can affect the match. A later repair may need a sample and a wider finishing decision.
What if the work was completed years ago?
Collect the records that can be verified, such as invoices, labels and dated photographs. Mark unknown details as unknown rather than reconstructing a confident but unconfirmed specification.